SRC Phase III is the latest development to their campus, across two very different sites. The College itself has been redeveloped not only to include a purpose built Construction, Engineering and Design Centre for Construction learners, but also to cater for growth in learner demand in Beauty, Holistic and Hospitality. Additionally a new sixth form facility – Bede College – was built to replace the existing buildings and allow learners to gain access to a state of the art facility, never previously enjoyed in the area.
Emergent was one of five companies who were set the challenge of furnishing this redevelopment, as the College looked to select a creative, innovative and forward thinking supplier who could not only meet their demanding needs, but exceed their expectations.
"For the £27m Stockton Riverside College redevelopment programme, Emergent was selected on the basis of the design solutions, quality and cost of product. Despite tight timetables and challenging site conditions the furniture was delivered and installed on time for the new buildings opening."
Richard Wainman , Projects Officer (Capital & Corporate) Stockton Riverside College